After a busy day moving soil and a bit of help from Lou, there is now another bed in place and a good amount of soil shifted and we managed to get the other door frame in place. Not as neat as Jeffs work but sturdy enough, I blame the weather conditions, thermal expansion and the way the moon was alligned with jupiter. (not my rushing to get it done attitude!)
Before installing the frame, I installed our 1500 litre water butt that will be placed in the tunnel, giving easy access to water for the plants at the correct temperature and to act as a energy sink, reducing extreme temperatures both hot and cold.
|
Bottom door frame, water butt in place and some rubble that we dug up |
|
new raised be on right, filled with soil from the mound |
|
hopefully the final tree root removal! |
No comments:
Post a Comment